For Renewing S330, S410 & S350
S330 Landscape and Recreation Contractors and
S410 Boiler, Pipeline, Waste Water, and Water Conditioner contractor classification need at least 2 hours (of their 6 hours of CE) related to backflow preventer installation every renewal cycle.
S350 HVAC Contractors must take 3 hours (of their 6 hours of CE) which is directly related to the installation, repair, or replacement of a heating, ventilation, or air conditioning system.
Tuesday Oct 19, 2021
8:30 AM - 3:30 PM MDT
Dixie Technical College
Industrial Building B, Room B203
FREE to SUHBA Members
$150 to Non-members - Ask about 40% Custom Fit Reimbursement
Printed courtesy of www.suhba.com/ – Contact the Southern Utah HBA for more information.
301 N 200 E Ste 2A, St George, UT 84770 – (435) 674-1400 – suhba@suhba.com